Private, no accountPrivacy details: browsing privately, no account needed
You're browsing privately, no account needed. Your region stays in this session and your precise location is never stored.What we store
RegulatoryNovember 6, 2026

Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA

Issued by Homeland Security Department

What the record says

The Coast Guard is changing the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. This rule will change the PS&P railroad bridge draw position to the fully closed-to-navigation position. Furthermore, this rule requires 24-hour notice for all drawbridge openings and a bridge operator will no longer be required to be on site.

This is a factual description of what was issued or decided, not an assessment of it.