Regulatory
Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
Issued by Homeland Security Department
What the record says
The Coast Guard is changing the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. This rule will change the PS&P railroad bridge draw position to the fully closed-to-navigation position. Furthermore, this rule requires 24-hour notice for all drawbridge openings and a bridge operator will no longer be required to be on site.
This is a factual description of what was issued or decided, not an assessment of it.